SLR at a Glance
There are no translations available.
Operation | Number of Trains per day | 411 |
Passenger Trains per day | 386 |
|
Goods Trains per day |
25 |
|
Passengers Carried per day | 348,206 |
|
Number of Stations | 162 | |
Number of of Sub Stations | 149 | |
Train Control Centers | 03 |
Tracks | Route Length | 1340.486 km |
Four Tracks | 1.895 km | |
Three Tracks | 11.878 km | |
Double Track | 140.693 km | |
Single Track | 1186.141 km | |
Gauge | 1676 mm | |
Rail Section | ||
Concrete Sleepers as percentage |
65% | |
Wooden Sleepers percentage |
33% | |
Level Crossings | 1061 |
Rolling Stock | Diesel Electric Locos | 96 |
Diesel Hydraulic Locos | 42 |
|
Diesel Multiple Units | 90 |
|
Carriages | 500 |
|
Goods Wagons | 683 | |
Oil Tankers | 128 |
Signalling | Centralized Controlling | 199.132 km |
Colour Light Signalling | 450.534 km | |
Electronic Interlocking | 78.40 km | |
Relay Interlocking | 385.661 km | |
Mechanical Interlocking | 736.343 km |
Level Crossings | Automatic Barrier | 130 |
Bell & Flashing Light | 155 |
|
Lever Operated Barrier | 140 |
|
Wing Type gates | 17 |
Revenue per Year | Passenger Transport revenue (From January up to August, 2014) |
Rs. 3225.33 Million |
Goods Transport | Rs. 352.09 Million |
අවසන් යාවත්කාලීන කිරීම 2014 නොවැම්බර් 05 වෙනි බදාදා, 04:42